Mithat YÜKSEL
MİTHAT YÜKSEL
Place&Date of Birth: Born in Gülşehir (Nevşehir) 1965, married, father of 3 children
Education: 1982-1986 Karadeniz Technical University/Trabzon Faculty of Engineering and Architecture - Department of Electrical and Electronics Engineering
Foreign Language: English
AREAS OF EXPERIENCE and EXPERTISE
23 September 2020 – Currently Deputy General Manager of EÜAŞ
2017– 23 September 2020 – ¬EÜAŞ Hydraulic Power Plants Department/ANKARA
Head of Department
In EÜAŞ Hydraulic Power Plants (48 units, 13,380 MW in total); He undertook the tasks of managing/coordinating all operational activities as well as planned/unplanned maintenance and troubleshooting; determining the constraint management and production planning targets of HEPPs based on cascade optimization, water revenues and efficiency; developing and conducting/managing survey, budgeting and technical analysis and rehabilitation projects at HEPPs; conducting preparation of HEPPs before privatization, post-privatization audit and execution of contracts; managing the works to provide peripheral service (Primary/Secondary frequency, Reactive Power Control) obligations at EÜAŞ Power Plants.
Major projects he is still conducting;
1- The rehabilitation project of all units of Keban HEPP (4x157.5 + 4x175=1330 MW) is still ongoing, and the core and windings of the generators belonging to the 1st and 2nd Units are manufactured in the EÜAŞ Sarıyar HEPP winding workshop and operating opportunities (domestic and national) It has started energy production by performing disassembly, assembly and commissioning works. The works of Units 3 and 4 have started.
2- Karakaya HEPP (6x300=1800 MW) Project of increasing turbine efficiency.
3- Gezende HEPP control systems renewal project.
4- Rehabilitation project for the vibration reduction works of Gezende HEPP 3 unit.
5- Aslantaş HEPP rehabilitation project.
Major projects that are under preparation;
1- Rehabilitation project of all components of Hirfanlı HEPP.
2- Rehabilitation project of all components of Sarıyar HEPP.
2008-2017 EÜAŞ Electricity Market Services Department/ANKARA
Head of Department
Within the Presidency; Making and executing all kinds of license transactions such as licensing, license amendment and all market agreements, including Ancillary service agreements (primary, secondary frequency, etc.), long-term energy sales and pricing through bilateral agreements, including energy auctions, production planning, hydrothermal optimization and portfolio management, energy trading in organized markets with offers in the Day-Ahead Market (DAM), Balancing Power Market (BPM) and Intraday Market (ECM), settlement Accounts and position tracking tasks at EÜAŞ Power Plants.
Along with the responsibilities and competencies of the Presidency;
1- Preparation of Transition Period Agreements (GDS),
2- Optimization of EÜAŞ hydro-thermal generation portfolio,
3- The design of new processes in the transition to the liberal market,
4- He developed the projects for creating regulations regulating energy sales with different tender models and methods, and carried out the task of project manager in these projects.
2005-2008 EÜAŞ Electricity Market Services Department/ANKARA
Production Planning and Market Monitoring Manager
He carried out the structuring process of EÜAŞ in the transition to liberal market in accordance with the sustainable energy policy with the abolished 4628 Electricity market law. In this context, he carried out market records of EÜAŞ power plants (Hydraulic, Thermal, Natural Gas), determination of technical characteristics of generation facilities, production planning and portfolio management in the transition period, price offers and fulfillment of ancillary service obligations, preparation, signing and implementation of transition period contracts, project management in the portfolio studies of EÜAŞ and commercial activities in market conditions.
2003-2005 EÜAŞ Hydraulic Power Plants Department/ANKARA
He took part in the research and development commission studies aimed at increasing the efficiency of Hydraulic Power Plants.
1993-2003 Karakaya HEPP Operations Directorate (1800MW installed power)/ DİYARBAKIR
Business Manager.
Affiliated Power Plants:
Kralkizi HEPP (94.5 MW Installed Power)
Dicle HEPP (100MW Installed Power)
Batman HEPP(198 MW Installed Capacity)
Together with Karakaya HEPP, he carried out the acceptance, commissioning, testing, operation and planned-unplanned maintenance works of the connected HEPPs and the switchgear facilities of the HEPPs (380 KW, 154 KW, 34.5 KW, ). He carried out the task of project manager in all projects carried out within the scope of the Operations Directorate.
1989-1993 Karakaya HEPP Operations Directorate/ DİYARBAKIR
Elk-Electronic Maintenance and Operation Engineer
Together with Karakaya HEPP, he carried out the operation, maintenance and troubleshooting activities of the connected HEPPs and the switchgear facilities of the HEPPs (380 KW, 154 KW, 34.5 KW, ) as the responsible engineer.
This page updated at 4 Ağustos 2025 07:01

