SEYHAN 1 HEPP

Seyhan-1 Dam and Hydroelectric Power Plant was built on the Seyhan River in the Çukurova Region, 8 km north of Adana. It has a total installed power of 60 MW with its 3 generators, each of which is 20 MW, and its annual production capacity is foreseen as 350 million kWh.

The construction of the Seyhan-1 Dam and Hydroelectric Power Plant was started in 1953 and its first production was realized on 08.04.1956.

The body volume of the dam, which was built in earth fill type, is 7.500.000 m³, the body height is 73.2 m, and the crest length is 1.955 m. The lake volume at the maximum water level is 831 hm³. 

It was also built in order to save the agricultural lands and Adana city center from flooding that may be caused by the Seyhan River.

IMG_1121_s1.jpg

Highlights

YEAR OF CONSTRUCTION

1956

WATER CAPACITY

831 hm³

INSTALLED POWER

60 MW

ANNUAL PRODUCTION

350 GWH

LOCATION

Adana

TURBINE TYPE

Vertical Franchis

NUMBER OF UNITS

3

BASIN

Seyhan

SEYHAN 1 HEPP

Media Gallery
IMG_1118_s1.jpg
IMG_1141_s1.jpg
IMG_1121_s1.jpg
IMG_1071_s1.jpg
IMG_1046_s1.jpg
IMG_1036_s1.jpg
Elektrik Üretim Anonim Şirketi

Contact Us

Central Building:
Mustafa Kemal District
Dumlupınar Avenue 7. Km No: 166
Postal Code: 06510
Çankaya/ANKARA/TÜRKİYE
Tel. Operator: +90 (312) 295 50 00

Fax Number: + 90 (312) 213 01 03
basinhalk@euas.gov.tr
REM: euas@hs01.kep.tr

Tax Office:
Ankara Kurumlar Vergi Dairesi Müdürlüğü
Yenimahalle/ANKARA
Tax Number: 331 0236 046

Write Us

Privacy Policy

Follow Us

To be informed about our services and activities, you can like the EÜAŞ Facebook page and follow the EÜAŞ Twitter account. Do not forget to share your valuable comments with us.

CimerTürkiyeEnerji Bakanlığı

Energy Saving Mode