Koyulhisar Hydroelectric Power Plant was built in the Koyulhisar district of Sivas and is fed by spring water. It has a total installed power of 200 kW with 2 generators of 100 kW each, and its annual production capacity is foreseen as 500,000 kWh.

Koyulhisar Hydroelectric Power Plant, built by Iller Bank, was put into operation in 1957 and transferred to TEK in 1983.

IMG-20191209-WA0022.jpg

Highlights

YEAR OF CONSTRUCTION

1957

WATER CAPACITY

INSTALLED POWER

200 kW

ANNUAL PRODUCTION

500.000 KWH

LOCATION

Sivas

TURBINE TYPE

Pelton

NUMBER OF UNITS

2

BASIN

KOYULHİSAR HEPP

Media Gallery
IMG-20191209-WA0022.jpg
IMG-20191209-WA0021.jpg
IMG-20191209-WA0018.jpg
IMG-20191209-WA0017.jpg
Elektrik Üretim Anonim Şirketi

Contact Us

Central Building:
Mustafa Kemal District
Dumlupınar Avenue 7. Km No: 166
Postal Code: 06510
Çankaya/ANKARA/TÜRKİYE
Tel. Operator: +90 (312) 295 50 00

Fax Number: + 90 (312) 213 01 03
basinhalk@euas.gov.tr
REM: euas@hs01.kep.tr

Tax Office:
Ankara Kurumlar Vergi Dairesi Müdürlüğü
Yenimahalle/ANKARA
Tax Number: 331 0236 046

Write Us

Privacy Policy

Follow Us

To be informed about our services and activities, you can like the EÜAŞ Facebook page and follow the EÜAŞ Twitter account. Do not forget to share your valuable comments with us.

CimerTürkiyeEnerji Bakanlığı

Energy Saving Mode