KILIÇKAYA HEPP

Kılıçkaya Dam and Hydroelectric Power Plant was built on Kelkit Stream, in the east of Sivas province, 25 km from Suşehri district and 7 km from Giresun-Şebinkarahisar highway. It has a total installed power of 120 MW with 2 generators, each of which is 60 MW, and its annual generation capacity is estimated as 332 million kWh.

The construction of Kılıçkaya Dam and Hydroelectric Power Plant, located in the Yeşilırmak Basin, started in 1981, and the 1st Group in 1990 and the 2nd Group in 1991 were put into operation.

The body height of the dam, which was built in clay core rock fill type, is 132.5 m and the crest length is 405 m. At the maximum water level, the lake volume is 1,260 hm³ and the lake area is 64 km².

Kılıçkaya Barajı ve HES 1, enerji (15)kk.jpg

Highlights

YEAR OF CONSTRUCTION

1990

WATER CAPACITY

1260 hm³

INSTALLED POWER

120

ANNUAL PRODUCTION

332 GWH

LOCATION

Sivas

TURBINE TYPE

Vertical Francis

NUMBER OF UNITS

2

BASIN

Yeşilırmak

KILIÇKAYA HEPP

Media Gallery
Kılıçkaya HES.JPG
KILIÇKAYA (9).JPG
KILIÇKAYA (1).JPG
Kılıçkaya 5.JPG
Kılıçkaya Barajı ve HES 1, enerji (15)kk.jpg
kılıçkaya barajı kk.jpg
Elektrik Üretim Anonim Şirketi

Contact Us

Central Building:
Mustafa Kemal District
Dumlupınar Avenue 7. Km No: 166
Postal Code: 06510
Çankaya/ANKARA/TÜRKİYE
Tel. Operator: +90 (312) 295 50 00

Fax Number: + 90 (312) 213 01 03
basinhalk@euas.gov.tr
REM: euas@hs01.kep.tr

Tax Office:
Ankara Kurumlar Vergi Dairesi Müdürlüğü
Yenimahalle/ANKARA
Tax Number: 331 0236 046

Write Us

Privacy Policy

Follow Us

To be informed about our services and activities, you can like the EÜAŞ Facebook page and follow the EÜAŞ Twitter account. Do not forget to share your valuable comments with us.

CimerTürkiyeEnerji Bakanlığı

Energy Saving Mode