ÇAMLICA-1 HEPP

Çamlıca-1 Hydroelectric Power Plant was built on the Zamantı river, one of the main branches of the Seyhan River, at a distance of 150 km from Kayseri province and 42 km from Yahyalı district. It has a total installed power of 84 MW with its 3 generators, each of which is 28 MW, and its annual generation capacity is foreseen as 429 million kWh.

Located in the Seyhan Basin, Çamlıca-1 Hydroelectric Power Plant was started to be built in 1995 as a BOT (YİD) project. The power plant, which was put into operation in December 1998, was transferred to our company on 12.12.2013. The electromechanical equipment of the river type power plant was supplied by the ABB-Sulzer consortium as a turnkey. Ability to work fully automatically without personnel is available and can be viewed remotely.

AYEN-2011-T2.jpg

Highlights

YEAR OF CONSTRUCTION

1998

WATER CAPACITY

INSTALLED POWER

84 MW

ANNUAL PRODUCTION

429 GWH

LOCATION

Kayseri

TURBINE TYPE

Vertical Franchis

NUMBER OF UNITS

3

BASIN

Seyhan

ÇAMLICA-1 HEPP

Media Gallery
AYEN-2011-T2.jpg
AYEN-2011-T1.jpg
800-image_10.jpg
Elektrik Üretim Anonim Şirketi

Contact Us

Central Building:
Mustafa Kemal District
Dumlupınar Avenue 7. Km No: 166
Postal Code: 06510
Çankaya/ANKARA/TÜRKİYE
Tel. Operator: +90 (312) 295 50 00

Fax Number: + 90 (312) 213 01 03
basinhalk@euas.gov.tr
REM: euas@hs01.kep.tr

Tax Office:
Ankara Kurumlar Vergi Dairesi Müdürlüğü
Yenimahalle/ANKARA
Tax Number: 331 0236 046

Write Us

Privacy Policy

Follow Us

To be informed about our services and activities, you can like the EÜAŞ Facebook page and follow the EÜAŞ Twitter account. Do not forget to share your valuable comments with us.

CimerTürkiyeEnerji Bakanlığı

Energy Saving Mode