TORTUM HEPP

Tortum Hydroelectric Power Plant was built on Tortum Lake in Uzundere district of Erzurum province. The power plant with an installed power of 26.2 MW (2x5,6MW+2x7.5MW) has an annual power generation capacity of 100 million kWh.

Tortum Lake was formed as a result of a mountain landslide in the west of today's Balıklı Village in the mid-1700s. The construction of Tortum Hydroelectric Power Plant started in 1952, and units 1 and 2 were completed and put into operation in 1960. Units 3 and 4, which were assembled after the third stage expansion construction, were put into service in 1972.

The filling volume of the Concrete Threshold (Natural lake) body is 3.185 m³, its length is 79 m, the lake volume is 57.5 hm³ and the lake area is 4.1 km².

Su alma ağzı 5_tor.jpg

Highlights

YEAR OF CONSTRUCTION

1960

WATER CAPACITY

57,5 hm³

INSTALLED POWER

26,2 MW

ANNUAL PRODUCTION

100 GWh

LOCATION

Erzurum

TURBINE TYPE

Vertical Francis

NUMBER OF UNITS

4

BASIN

Çoruh

TORTUM HEPP

Media Gallery
Santral binası 3.jpg
Su alma ağzı 5_tor.jpg
Dolu Savaklar 2_tor.jpg
cebri boru su kanalı2_tor.jpg
su alma ağzı 2_tor.jpg
Su alma ağzı 1_tor.jpg
Elektrik Üretim Anonim Şirketi

Contact Us

Central Building:
Mustafa Kemal District
Dumlupınar Avenue 7. Km No: 166
Postal Code: 06510
Çankaya/ANKARA/TÜRKİYE
Tel. Operator: +90 (312) 295 50 00

Fax Number: + 90 (312) 213 01 03
basinhalk@euas.gov.tr
REM: euas@hs01.kep.tr

Tax Office:
Ankara Kurumlar Vergi Dairesi Müdürlüğü
Yenimahalle/ANKARA
Tax Number: 331 0236 046

Write Us

Privacy Policy

Follow Us

To be informed about our services and activities, you can like the EÜAŞ Facebook page and follow the EÜAŞ Twitter account. Do not forget to share your valuable comments with us.

CimerTürkiyeEnerji Bakanlığı

Energy Saving Mode