TOPÇAM HEPP

Topçam Dam and Hydroelectric Power Plant was built on the Melet River, 40 km from Mesudiye district of Ordu province and 64 km from Ordu city center. It has a total installed power of 61.35 MW with 3 generators, each of which is 20,45 MW, and its annual production capacity is foreseen as 200 million kWh.

The construction of Topçam Dam and HEPP, located in the Yeşilırmak Basin, started in 1996 and started production at full capacity in early 2017.

The height of the dam, which was built in clay core rock fill type, from the foundation is 122 m. The maximum reservoir volume is 132 hm³ and the water in the dam lake reaches the power plant through a 7.5 km energy tunnel.

IMG_9791.PNG

Highlights

YEAR OF CONSTRUCTION

2017

WATER CAPACITY

132 hm³

INSTALLED POWER

61,35

ANNUAL PRODUCTION

200 GWH

LOCATION

Ordu

TURBINE TYPE

NUMBER OF UNITS

3

BASIN

Yeşilırmak

TOPÇAM HEPP

Media Gallery
IMG_9782.JPG
IMG_2036.JPG
IMG_9778.JPG
IMG_9784.JPG
IMG_9789.JPG
IMG_9791.PNG
Elektrik Üretim Anonim Şirketi

Contact Us

Central Building:
Mustafa Kemal District
Dumlupınar Avenue 7. Km No: 166
Postal Code: 06510
Çankaya/ANKARA/TÜRKİYE
Tel. Operator: +90 (312) 295 50 00

Fax Number: + 90 (312) 213 01 03
basinhalk@euas.gov.tr
REM: euas@hs01.kep.tr

Tax Office:
Ankara Kurumlar Vergi Dairesi Müdürlüğü
Yenimahalle/ANKARA
Tax Number: 331 0236 046

Write Us

Privacy Policy

Follow Us

To be informed about our services and activities, you can like the EÜAŞ Facebook page and follow the EÜAŞ Twitter account. Do not forget to share your valuable comments with us.

CimerTürkiyeEnerji Bakanlığı

Energy Saving Mode