TEKİRDAĞ/ÇERKEZKÖY-İSTANBUL/ÇATALCA LIGNITE FIELD
Works on Tekirdağ/Çerkezköy Lignite Field have been completed.
According to the Pre-feasibility (Reserve) Report prepared in 2018;
Reserve Amount: 70 million tons
Calorific Value: 2.070 Kcal/kg
Operation Method: Underground Mining