TEKIRDAG NATURAL GAS COMBINED CYCLE B POWER PLANT

The facility is located in Marmara Ereğli district of Tekirdağ province.

Trakya Marmara Ereğlisi Natural Gas Combined Cycle Power Plant consists of 2 gas turbines (2 pcs. Siemens V94.2 gas turbine with silo type combustion chamber.), 2 gas turbine generators, 2 boilers (2 pcs. Nooter Ericson Waste Heat Boiler with 550 tons/hour capacity.), 1 condenser (Cooling system is a single pass from sea water, 22000 tons/hour flow condenser.), 1 steam turbine (1 piece of Siemens KN Series high, medium, low pressure steam turbine.) and a combined cycle block containing 1 steam turbine generator. Trakya Marmara Ereğlisi Natural Gas Combined Cycle Power Plant, 2 gas turbines (2 pcs. Siemens V94.2 gas turbine with silo type combustion chamber.), 2 gas turbine generators, 2 boilers (2 pcs. Nooter Ericson Waste Heat Boiler with 550 tons/hour capacity.), It consists of 1 condenser (Cooling system is a single pass from sea water, 22000 tons/hour flow condenser.), 1 steam turbine (1 piece of Siemens KN Series high, medium, low pressure steam turbine.) and a combined cycle block containing 1 steam turbine generator. There are 2 systems to produce pure water from sea water with a capacity of approximately 1000 tons/day. Natural gas is taken from the neighboring Botaş LNG facility at 70 bar pressure. And the electricity system is connected to the 154 kV distribution network at Botaş, Tegesan, Çerkezköy and Silivri points.

Fuel consumption at 100% load for the 1st Block gas turbine in the power plant is 43.000 Sm³/hour and the total fuel consumption of the two gas turbines is 86,000 Sm³/hour. The net thermal efficiency is around 50% at a heat consumption of 1870 kcal/kWh for 2 GT+1 BT at 100% load, with a lower fuel calorific value of 8650 kcal/Sm³.

3.png

Highlights

YEAR OF CONSTRUCTION

1999

LOCATION

Tekirdağ

INSTALLED POWER

478 MW

ANNUAL PRODUCTION

3.600 Gwh

NUMBER OF UNITS

3

TEKIRDAG NATURAL GAS COMBINED CYCLE B POWER PLANT

Media Gallery
6.png
1.png
2.png
7.png
5.png
3.png
Elektrik Üretim Anonim Şirketi

Contact Us

Central Building:
Mustafa Kemal District
Dumlupınar Avenue 7. Km No: 166
Postal Code: 06510
Çankaya/ANKARA/TÜRKİYE
Tel. Operator: +90 (312) 295 50 00

Fax Number: + 90 (312) 213 01 03
basinhalk@euas.gov.tr
REM: euas@hs01.kep.tr

Tax Office:
Ankara Kurumlar Vergi Dairesi Müdürlüğü
Yenimahalle/ANKARA
Tax Number: 331 0236 046

Write Us

Privacy Policy

Follow Us

To be informed about our services and activities, you can like the EÜAŞ Facebook page and follow the EÜAŞ Twitter account. Do not forget to share your valuable comments with us.

CimerTürkiyeEnerji Bakanlığı

Energy Saving Mode