TEKIRDAG NATURAL GAS COMBINED CYCLE A POWER PLANT

The facility is located in Marmara Ereğli district of Tekirdağ province.

The facility was built as a Natural Gas Combined Cycle Power Plant and has the capacity to deliver approximately 480 MW of power. The plant is designed to operate with 52% efficiency for base load operation. The total nominal installed power of the power plant (2+1 configuration), which consists of 2 Gas Turbines and 1 Steam Turbine, is 480 MW, and the output power can go up to 500 MW in winter and decrease up to 420 MW in summer, depending on climatic conditions. The power plant, which has an annual average production capacity of 3.9 billion kWh, started commercial production in June 1999 and its agreement would expire in 2019. The power plant was transferred to our Company on 5 June 2019 and has been operated by our organization since this date.

10.jpg

Highlights

YEAR OF CONSTRUCTION

1999

LOCATION

Tekirdağ

INSTALLED POWER

480 MW

ANNUAL PRODUCTION

3.900 Gwh

NUMBER OF UNITS

3

TEKIRDAG NATURAL GAS COMBINED CYCLE A POWER PLANT

Media Gallery
2.jpg
10.jpg
12.jpg
13.jpg
14.jpg
15.jpg
16.jpg
7.jpg
Elektrik Üretim Anonim Şirketi

Contact Us

Central Building:
Mustafa Kemal District
Dumlupınar Avenue 7. Km No: 166
Postal Code: 06510
Çankaya/ANKARA/TÜRKİYE
Tel. Operator: +90 (312) 295 50 00

Fax Number: + 90 (312) 213 01 03
basinhalk@euas.gov.tr
REM: euas@hs01.kep.tr

Tax Office:
Ankara Kurumlar Vergi Dairesi Müdürlüğü
Yenimahalle/ANKARA
Tax Number: 331 0236 046

Write Us

Privacy Policy

Follow Us

To be informed about our services and activities, you can like the EÜAŞ Facebook page and follow the EÜAŞ Twitter account. Do not forget to share your valuable comments with us.

CimerTürkiyeEnerji Bakanlığı

Energy Saving Mode