KESİKKÖPRÜ HEPP
Kesikköprü Dam and Hydroelectric Power Plant was built on the Kızılırmak River, 25 km from Hirfanlı HEPP and 110 km from Ankara. It has a total installed power of 76 MW with 2 generators, each of which is 38 MW, and its annual generation capacity is estimated as 250 million kWh.
The construction of the Kesikköprü Dam and Hydroelectric Power Plant, located in the Kızılırmak Basin, started in 1959. The project, whose civil works were carried out by Latif Sepil and Buros(Turkey)and hardware-related works by FrancoTosi–Ansaldo–Ercole Marelli (Italy) companies, started to hold water on 11.12.1966 and was put into operation on 27.02.1967. The body volume of the dam, which was built in soil and rock body fill type, is 812.000 m³, crest height is 49 m, and crest length is 265 m. The lake volume at the maximum water level is 110 hm³, and the lake area is 6.50 km².
Highlights
YEAR OF CONSTRUCTION
1967
WATER CAPACITY
110 hm³
INSTALLED POWER
76
ANNUAL PRODUCTION
250 GWH
LOCATION
Ankara
TURBINE TYPE
Vertical Franchis
NUMBER OF UNITS
2
BASIN
Kızılırmak
KESİKKÖPRÜ HEPP
Media Gallery
KESİKKÖPRÜ HEPP
Contact Info
Kesikköprü Kızılırmak Mahallesi Dış Kapı No:54 Posta Kodu:06720 Bala/ANKARA
0312 874 14 77
0 312 874 12 77