KEPEZ 1 HEPP

Kepez 1 HEPP is a canal type power plant located within the borders of Antalya city center and produces electricity with the water released from Kepez 2 HEPP. Kırkgöz is fed from the water source. It has a total installed power of 26.4 MW with its 3 generators, each of which is 8.8 MW, and its annual generation capacity is predicted as 150 million kWh.

The Kepez Project, as a multi-purpose project, started to be constructed by the General Directorate of Etibank in 1955 and was put into operation in 1961.

Kepez 1 Hydroelectric Power Plant produces energy by dropping water from 162 m with a 653.71 m long and 2.50 m inner diameter reinforced concrete penstock from the forebay to 47.55 m reinforced concrete surge tank and from it with a 758 m long steel penstock.

DSC_2247_1.jpg

Highlights

YEAR OF CONSTRUCTION

1961

WATER CAPACITY

INSTALLED POWER

26,4 MW

ANNUAL PRODUCTION

150 GWh

LOCATION

Antalya

TURBINE TYPE

Vertical Franchis

NUMBER OF UNITS

3

BASIN

KEPEZ 1 HEPP

Media Gallery
DSC_2386.JPG
DSC_2314.JPG
DSC_2247_1.jpg
DSC_2412_1.jpg
Elektrik Üretim Anonim Şirketi

Contact Us

Central Building:
Mustafa Kemal District
Dumlupınar Avenue 7. Km No: 166
Postal Code: 06510
Çankaya/ANKARA/TÜRKİYE
Tel. Operator: +90 (312) 295 50 00

Fax Number: + 90 (312) 213 01 03
basinhalk@euas.gov.tr
REM: euas@hs01.kep.tr

Tax Office:
Ankara Kurumlar Vergi Dairesi Müdürlüğü
Yenimahalle/ANKARA
Tax Number: 331 0236 046

Write Us

Privacy Policy

Follow Us

To be informed about our services and activities, you can like the EÜAŞ Facebook page and follow the EÜAŞ Twitter account. Do not forget to share your valuable comments with us.

CimerTürkiyeEnerji Bakanlığı

Energy Saving Mode