ISTANBUL NATURAL GAS COMBINED CYCLE A POWER PLANT

The power plant, also known as Ambarlı Natural Gas A Power Plant, is located in the Beylikdüzü district of Istanbul.

d.gaz resim_0015_ist.jpg

Highlights

YEAR OF CONSTRUCTION

1988

LOCATION

İstanbul

INSTALLED POWER

1350,9 MW

ANNUAL PRODUCTION

9.450 Gwh

NUMBER OF UNITS

9

ISTANBUL NATURAL GAS COMBINED CYCLE A POWER PLANT

Media Gallery
d.gaz resim_0001_ist.jpg
d.gaz resim_0018_ist.jpg
d.gaz resim_0015_ist.jpg
26.07.2013 012_ist.jpg
Elektrik Üretim Anonim Şirketi

Contact Us

Central Building:
Mustafa Kemal District
Dumlupınar Avenue 7. Km No: 166
Postal Code: 06510
Çankaya/ANKARA/TÜRKİYE
Tel. Operator: +90 (312) 295 50 00

Fax Number: + 90 (312) 213 01 03
basinhalk@euas.gov.tr
REM: euas@hs01.kep.tr

Tax Office:
Ankara Kurumlar Vergi Dairesi Müdürlüğü
Yenimahalle/ANKARA
Tax Number: 331 0236 046

Write Us

Privacy Policy

Follow Us

To be informed about our services and activities, you can like the EÜAŞ Facebook page and follow the EÜAŞ Twitter account. Do not forget to share your valuable comments with us.

CimerTürkiyeEnerji Bakanlığı

Energy Saving Mode