Dicle Dam and Hydroelectric Power Plant was built within the borders of Diyarbakır province, 50 km from Diyarbakır, 800 m from the location where Maden and Dibni Streams merge to form the Tigris River, and 22 km downstream of the Kralkızı Dam axis. It has a total installed power of 110 MW with 2 generators of 55 MW each, and its annual generation capacity is estimated as 298 million kWh.

Project studies for the Dicle Dam and Hydroelectric Power Plant, located in the Dicle Basin, started in 1986. In the project, which started to be impounded on October 25, 1997, the construction was completed on December 30, 1997 and production started in 2000.

The body volume of the dam, which was built in the rock body fill type, is 3.120.000 m³, the body height is 75 m, and the crest length is 307 m. At the maximum water level, the lake volume is 595 hm³ and the lake area is 24.00 km².

IMG_0036_dicle.jpg

Highlights

YEAR OF CONSTRUCTION

2000

WATER CAPACITY

595 hm³

INSTALLED POWER

110 MW

ANNUAL PRODUCTION

298 GWh

LOCATION

Diyarbakır

TURBINE TYPE

Vertical Axis Franchis

NUMBER OF UNITS

2

BASIN

Dicle

DİCLE HEPP

Media Gallery
IMG_0031_dicle.jpg
IMG_0030_dicle.jpg
IMG_0029_dicle.jpg
IMG_0036_dicle.jpg
IMG_0034_dicle.jpg
IMG_0028_dicle.jpg
IMG_0037_dicle.jpg
IMG-20171122-WA0008.jpg
Elektrik Üretim Anonim Şirketi

Contact Us

Central Building:
Mustafa Kemal District
Dumlupınar Avenue 7. Km No: 166
Postal Code: 06510
Çankaya/ANKARA/TÜRKİYE
Tel. Operator: +90 (312) 295 50 00

Fax Number: + 90 (312) 213 01 03
basinhalk@euas.gov.tr
REM: euas@hs01.kep.tr

Tax Office:
Ankara Kurumlar Vergi Dairesi Müdürlüğü
Yenimahalle/ANKARA
Tax Number: 331 0236 046

Write Us

Privacy Policy

Follow Us

To be informed about our services and activities, you can like the EÜAŞ Facebook page and follow the EÜAŞ Twitter account. Do not forget to share your valuable comments with us.

CimerTürkiyeEnerji Bakanlığı

Energy Saving Mode