DERBENT HEPP

Derbent Dam and Hydroelectric Power Plant was built on the Kızılırmak River, 15 km southwest of Bafra district of Samsun. The annual generation capacity of the power plant of which installed power is 56.4 MW (2x25.2MW+1x6MW) is estimated as 257 million kWh.

The construction works of Derbent Dam and Hydroelectric Power Plant located in the Kızılırmak Basin started on February 22, 1985 by DSI and was completed in mid-1991 and put into operation. The body volume of the dam, which was built in clay core rock fill type, is 2.500.000 m³, the body height is 34 m and the crest length is 517 m. The lake volume is 212.5 hm³ at the maximum operating level and the lake area is 16.50 km² at the normal water level. The energy produced at the power plant is given to the interconnected system via Altınkaya HEPP and Bafra Switchyard.

IMG_9340_1.jpg

Highlights

YEAR OF CONSTRUCTION

1991

WATER CAPACITY

212,5 hm³

INSTALLED POWER

56,4 MW

ANNUAL PRODUCTION

257 GWh

LOCATION

Samsun

TURBINE TYPE

Vertical Tiger

NUMBER OF UNITS

3

BASIN

Kızılırmak

DERBENT HEPP

Media Gallery
IMG_9369_1.jpg
IMG_9325_1.jpg
IMG_9392_1.jpg
IMG_9382_1.jpg
IMG_9340_1.jpg
Elektrik Üretim Anonim Şirketi

Contact Us

Central Building:
Mustafa Kemal District
Dumlupınar Avenue 7. Km No: 166
Postal Code: 06510
Çankaya/ANKARA/TÜRKİYE
Tel. Operator: +90 (312) 295 50 00

Fax Number: + 90 (312) 213 01 03
basinhalk@euas.gov.tr
REM: euas@hs01.kep.tr

Tax Office:
Ankara Kurumlar Vergi Dairesi Müdürlüğü
Yenimahalle/ANKARA
Tax Number: 331 0236 046

Write Us

Privacy Policy

Follow Us

To be informed about our services and activities, you can like the EÜAŞ Facebook page and follow the EÜAŞ Twitter account. Do not forget to share your valuable comments with us.

CimerTürkiyeEnerji Bakanlığı

Energy Saving Mode