ÇAMLIGÖZE HEPP

Çamlıgöze Dam and Hydroelectric Power Plant was built on Kelkit Stream, 140 km from Sivas province and 12 km from Suşehri district. It has a total installed power of 32 MW with 2 generators, each of which is 16 MW, and its annual generation capacity is foreseen as 102 million kWh.

The construction of Çamlıgöze Dam and Hydroelectric Power Plant, located in the Yeşilırmak Basin, was started in 1987, and its construction was completed in 2000 and production started. The dam, which was built in clay core rock fill type, has a crest length of 360 m and a body height of 32 m. At the maximum water level, the lake volume is 54.7 hm³ and the lake area is 5 km².

e92b42ef-1db.jpeg

Highlights

YEAR OF CONSTRUCTION

2000

WATER CAPACITY

54,7 hm³

INSTALLED POWER

32 MW

ANNUAL PRODUCTION

102 GWh

LOCATION

Sivas

TURBINE TYPE

Vertical Tiger

NUMBER OF UNITS

2

BASIN

Yeşilırmak

ÇAMLIGÖZE HEPP

Media Gallery
53abf1a8-4e8.jpg
e92b42ef-1db.jpeg
e2886285-4c0.jpeg
camligoze-baraji.jpg
4f375025-dfa.jpeg
Elektrik Üretim Anonim Şirketi

Contact Us

Central Building:
Mustafa Kemal District
Dumlupınar Avenue 7. Km No: 166
Postal Code: 06510
Çankaya/ANKARA/TÜRKİYE
Tel. Operator: +90 (312) 295 50 00

Fax Number: + 90 (312) 213 01 03
basinhalk@euas.gov.tr
REM: euas@hs01.kep.tr

Tax Office:
Ankara Kurumlar Vergi Dairesi Müdürlüğü
Yenimahalle/ANKARA
Tax Number: 331 0236 046

Write Us

Privacy Policy

Follow Us

To be informed about our services and activities, you can like the EÜAŞ Facebook page and follow the EÜAŞ Twitter account. Do not forget to share your valuable comments with us.

CimerTürkiyeEnerji Bakanlığı

Energy Saving Mode