For the construction of the power plant, environmental, economic and technical evaluations were made and Ovaakça Village in Bursa province was selected in 1993. An international tender was made for Bursa Natural Gas Combined Cycle Power Plant on 26.12.1994.

The power plant with an installed power of 1,432 MW was established for purposes such as meeting the current electrical energy demand in Southern Marmara and especially Bursa region with the least loss and in the most economical way, when taken into account the increase in energy demand in the region, being able to respond to this need in the medium term, providing healthier and uninterrupted energy to the industrial establishments in the region, increasing the stabilization opportunity in the system by reducing the losses and providing new job opportunities for the increasing population in the short and long term. The 4x239 + 2x238 = 1432 MW Power Plant was put into operation in 1998-1999. The nominal annual production capacity of the power plant is 10,017,000,000 kWh.

5.jpg

Highlights

YEAR OF CONSTRUCTION

1998

LOCATION

Bursa

INSTALLED POWER

1432 MW

ANNUAL PRODUCTION

10.017 Gwh

NUMBER OF UNITS

6

BURSA NATURAL GAS COMBINED CYCLE POWER PLANT

Media Gallery
1.jpg
4.jpg
2.jpg
6.jpg
3.jpg
5.jpg
Elektrik Üretim Anonim Şirketi

Contact Us

Central Building:
Mustafa Kemal District
Dumlupınar Avenue 7. Km No: 166
Postal Code: 06510
Çankaya/ANKARA/TÜRKİYE
Tel. Operator: +90 (312) 295 50 00

Fax Number: + 90 (312) 213 01 03
basinhalk@euas.gov.tr
REM: euas@hs01.kep.tr

Tax Office:
Ankara Kurumlar Vergi Dairesi Müdürlüğü
Yenimahalle/ANKARA
Tax Number: 331 0236 046

Write Us

Privacy Policy

Follow Us

To be informed about our services and activities, you can like the EÜAŞ Facebook page and follow the EÜAŞ Twitter account. Do not forget to share your valuable comments with us.

CimerTürkiyeEnerji Bakanlığı

Energy Saving Mode