BATMAN HEPP

Batman Dam and Hydroelectric Power Plant was built on Batman Stream, 70 km from Batman. The power plant has an annual capacity of generating 483 million kWh of electrical energy with an installed power of 198,475 MW (3x64,175 MW+1x5.95 MW).

The construction of Batman Dam and Hydroelectric Power Plant, located in the Tigris Basin, started in 1986 and production started in 2003.

The body volume of the dam, which was built in the clay core zoned earth fill type, is 7.18 hm³, the body height is 85 m and the crest length is 530 m. At the maximum operating level, the lake volume is 1.244 hm³ and the lake area is 49.25 km².

BATMAN BARAJI.JPG

Highlights

YEAR OF CONSTRUCTION

2003

WATER CAPACITY

1244 hm³

INSTALLED POWER

198,475 MW

ANNUAL PRODUCTION

483 GWh

LOCATION

Diyarbakır

TURBINE TYPE

Vertical Francis

NUMBER OF UNITS

4

BASIN

Dicle

BATMAN HEPP

Media Gallery
BATMAN BARAJI.JPG
Elektrik Üretim Anonim Şirketi

Contact Us

Central Building:
Mustafa Kemal District
Dumlupınar Avenue 7. Km No: 166
Postal Code: 06510
Çankaya/ANKARA/TÜRKİYE
Tel. Operator: +90 (312) 295 50 00

Fax Number: + 90 (312) 213 01 03
basinhalk@euas.gov.tr
REM: euas@hs01.kep.tr

Tax Office:
Ankara Kurumlar Vergi Dairesi Müdürlüğü
Yenimahalle/ANKARA
Tax Number: 331 0236 046

Write Us

Privacy Policy

Follow Us

To be informed about our services and activities, you can like the EÜAŞ Facebook page and follow the EÜAŞ Twitter account. Do not forget to share your valuable comments with us.

CimerTürkiyeEnerji Bakanlığı

Energy Saving Mode